M3 motorway

Following the change to a democratic regime, the motorway was completed to Füzesabony in 1998, to the Polgár junction in 2002, and to Görbeháza in 2004. In 2007, the section running to the Nyíregyháza bypass was opened, followed by the Nyíregyháza-Őr stretch in 2013. FERROBETON Zrt. has been the continuous supplier of bridge beams for the project, and by developing the FI 150 bridge beam provided a design alternative that allowed planning single-span bridge structures on the motorway section between Nyíregyháza and Vásárosnamény.

Date of execution:
1998
Ground-space:
m2
Location:
Füzesabony-Vásárosnamény
Services:
Production Transport

Services

BezárásDesign

Design

BezárásProduction

Production

BezárásTransport

Transport

BezárásExecution

Execution