Hankook Tyre Factory, Rácalmás

The first phase of this factory of the premium Korean tire manufacturer Hankook Tire was built in 2007, the second in 2010, and the third in 2014, giving Hankook Tire an annual Hungarian capacity of nearly 17 million tires per year. The combined size of the three phases is over 150,000 square meters. Investor: Hankook Tire General contractor: Grabarics Építóipari Kft., KÉSZ Zrt.

Date of execution:
2014
Ground-space:
150000 m2
Location:
Rácalmás
Services:
Design Execution Production Transport

Services

BezárásDesign

Design

BezárásProduction

Production

BezárásTransport

Transport

BezárásExecution

Execution