Development of More Durable, Easier-to-Install Precast Concrete Elements with Increased Load Capacity and Efficient Manufacturing Technology
The service life of reinforced concrete and prestressed reinforced concrete structures is reduced, while maintenance costs increase as a result of reinforcement corrosion. According to a scientific publication by Cuenca et al. (2019), costs associated with corrosion damage account for 3.4% of the global Gross Domestic Product (GDP). One of the objectives of the project is to contribute to reducing these enormous corrosion-related costs through the development of highly durable concrete elements.
Beneficiary: FERROBETON Dunaújváros Concrete and Reinforced Concrete Element Manufacturing Private Company Limited by Shares
Project Title: “Development of More Durable, Easier-to-Install Precast Concrete Elements with Increased Load Capacity and Efficient Manufacturing Technology”
Grant Amount: 215,007,100 HUF
Funding Intensity: 47.571521%
Project Overview
The service life of reinforced concrete and prestressed reinforced concrete structures is reduced, while maintenance costs increase as a result of reinforcement corrosion. According to a scientific study published by Cuenca et al. (2019), costs associated with corrosion damage account for 3.4% of the global Gross Domestic Product (GDP). One of the project’s objectives is to contribute to reducing these immense corrosion-related costs through the development of highly durable concrete elements.
In the rapidly evolving and constantly changing world of recent decades, the construction industry has lagged somewhat behind. It remains one of the least mechanized and automated industries, which, in this developing economic environment, limits its cost-effective growth. Its high labour demand makes construction processes slower and less economical. As a further objective of the project, we aim to accelerate construction processes through innovative precast elements, thereby reducing labour requirements and enabling not only more cost-effective but also faster project execution.
Our objective is to develop precast concrete elements together with the industrialized manufacturing technologies and structural design methods required for their production, using non-corrosive materials to increase durability and load-bearing capacity while reducing labour demand. These materials include fibre reinforced polymer (FRP), fibre-reinforced concrete incorporating synthetic fibres, and a completely new cement-based carbon-fibre reinforcement system.
The precast concrete elements to be developed, including wall panels, piles, railway overhead line supports, drainage channels, and beams, will utilize high-strength, non-corrosive reinforcement systems (and discrete fibres). By eliminating or significantly reducing the use of steel, concrete elements and structures can achieve substantially longer service lives. Additional benefits include more economical operation and significantly lower life-cycle costs (20-50%).
The applied synthetic fibres (i.e. fibre-reinforced concrete) together with precast manufacturing ensure cost-effective and rapid production and installation of the developed concrete elements, as labour requirements can be substantially reduced. Fibres mixed into the concrete can partially or completely replace labour-intensive steel reinforcement works, while prefabrication allows on-site construction activities to be completed with less labour and in a shorter time.
The most important expected outcome of the project at the corporate level is the creation, introduction, and commercialization of new product groups in both domestic and international construction markets. Commercialization of the knowledge and new technologies generated during the project may also become possible.
Within the framework of the project, the world’s first precast transportation and infrastructure concrete elements reinforced with cement-impregnated carbon-fibre reinforcement will be produced, including approximately 12-metre-long piles and approximately 8-metre-high overhead line support poles, as well as the first beams with a length of at least 8.6 metres. Furthermore, the first Hungarian prototype of a precast fibre-reinforced wall panel will be developed, representing a significant achievement even at the international level. The sustainability of the project is ensured by the commercialization of the resulting technologies and products, as there is already market demand for the planned outputs, including precast wall panels, piles, overhead line supports, and specialised bridge and structural building beams.
With regard to the new bridge girders and transportation infrastructure concrete elements, the Hungarian State, represented by NIF (National Infrastructure Development Company) and MÁV (Hungarian State Railways), may become the primary user and installer of the project outcomes throughout the country. In the case of railway overhead line supports, this development is particularly timely due to the planned Budapest-Belgrade high-speed railway project. The new precast wall panel system and structural building beams may serve as valuable solutions for both public and private investments. In addition, neighbouring countries as well as more distant international markets are considered target markets for the project results.
Project Completion Date: 30 November 2023
Project Identification Number: 2019-1.1.1-PIACI-KFI-2019-00142
Workplace Training Programmes for Employees of FERROBETON Plc.
Implementation of workplace training programmes for the employees of FERROBETON Plc. – GINOP-6.1.5-17-2018-00009
Beneficiary: FERROBETON Dunaújváros Concrete and Reinforced Concrete Element Manufacturing Private Company Limited by Shares
Grant Amount: HUF 26,650,964
Funding Intensity: 54.54%
Project Overview
As part of the development programme, five different training courses were implemented: Leadership Effectiveness Development, Industry 4.0, LEAN, IKER1, and IKER2.
To ensure the smooth implementation of the project, a professionally substantiated training plan was prepared during the preparatory phase with the involvement of an external service provider.
Employees from disadvantaged backgrounds, based on factors such as age and educational attainment, were also included in the training programmes. A total of 46% of the participating employees belonged to disadvantaged groups.
During the project, training was also provided to 15 individuals from the target groups of job seekers, public employment participants, and economically inactive persons who were not employees of the company. To support the successful completion of their training, two workplace mentors were employed.
All training programmes implemented within the project contribute to enhancing the Company’s competitiveness, improving production efficiency, and supporting the long-term development and implementation of Industry 4.0 technologies.
Project Completion Date: 3 July 2021
Project Identification Number: GINOP-6.1.5-17-2018-00009
Materials Science Development of Advanced Concrete Elements
Our objective is to develop concrete elements, together with the required industrialized production technologies and structural design methodologies, in which non-corrosive materials are used to resist tensile forces.
Beneficiaries:
UVATERV Road and Railway Design Private Company Limited by Shares (Consortium Leader)
FERROBETON Dunaújváros Concrete and Reinforced Concrete Element Manufacturing Private Company Limited by Shares (Consortium Member)
Budapest University of Technology and Economics (Consortium Member)
Grant Amount: 681,749,827 HUF
Funding Intensity: 65.18%
Project Overview
The service life of reinforced concrete and prestressed reinforced concrete structures is reduced, while maintenance costs increase due to the corrosion of steel reinforcement. Although partial solutions already exist to prevent corrosion damage, such as improving the density of the concrete microstructure, increasing concrete cover thickness, or coating steel reinforcement with epoxy resin, none of these methods fully eliminates the problem.
In the case of infrastructure structures, corrosion-related damage and refurbishment costs are significant on a national scale every year. As a consequence, certain renovation projects are unfortunately postponed or omitted altogether, which may lead to the accelerated deterioration of bridge structures. The results of this project would contribute significantly to improving this situation.
Our objective is to develop concrete elements, together with the industrialized production technologies and structural design methodologies required for their manufacture, in which non-corrosive materials are used to resist tensile forces.
The technology being developed will enable the production of load-bearing elements, including bridge girders and roof shell structural components, in which tensile forces are carried by high-strength, non-corrosive fibre reinforced polymer (FRP) reinforcement. In the absence of steel, concrete elements and structures can achieve significantly longer service lives, resulting in more economical operation and lower life-cycle costs.
The second development direction focuses on the creation of textile reinforced concrete shell structures. In this case, tensile forces arising within the shell structure are carried by FRP textile reinforcements. In specific applications, textile reinforced concrete shell structures may also serve as permanent formwork. The use of textile reinforcement enables the creation of a wide variety of architectural forms and structural solutions that were previously not feasible. Furthermore, due to the reduced concrete cover requirements resulting from the absence of corrosion risk, elements with substantially lower self-weight can be produced, enabling structures with greater spans. An additional advantage of textile reinforcement systems is their superior fire resistance compared to steel.
Modelling force transfer within the various forms enabled by this technology represents a significant engineering challenge. Therefore, small-scale prototypes will be developed using 3D concrete printing technology.
The most important expected outcome of the project at the corporate level is the creation, market introduction, and commercialization of a new product group in both domestic and international construction markets. The commercialization of the knowledge and new technologies generated through the project may also become possible. Within the framework of the project, the first Hungarian prototype of a prestressed precast FRP bridge girder will be produced, representing a significant achievement at an international level.
The research background for the project is provided by the laboratory infrastructure of BME and the expertise gained through its extensive concrete research activities. 3D concrete printing is a completely new technology both in Hungary and internationally. One of its technological predecessors is shotcrete technology, in which UVATERV has already acquired substantial knowledge and experience through previous research and development projects. In addition, numerous successful development projects have been completed in cooperation with FERROBETON Plc., providing a reliable foundation for prototype production.
The sustainability of the project is ensured through the commercialization of the resulting technologies and products, as there is already market demand for the planned outputs, including specialised bridge girders, structural building beams, shell structures, and related applications.
Planned Project Completion Date: 31 March 2022
Project Identification Number: 2018-1.3.1-VKE-2018-00003
Development of High-Performance Prestressed Reinforced Concrete Girders
Within the framework of project GINOP_PLUSZ-2.1.1-21-2022-00095, two new families of high-performance prestressed reinforced concrete girders are being developed. One is a girder with an increased flange width designed for spans of 30 to 45 metres, while the other is a U-shaped bridge girder family for spans of up to 36 to 38 metres. The research and development programme also investigates the potential application of structural lightweight concrete, which, if proven successful, may serve as a material for these girders. The new technologies are primarily intended for use in Hungarian state infrastructure developments, including projects carried out by NIF and MÁV.
Beneficiary: FERROBETON Dunaújváros Concrete and Reinforced Concrete Element Manufacturing Plc.
Subject of the Development: Development of High-Performance Prestressed Reinforced Concrete Main Girders
Contracted Grant Amount: 276,505,834 HUF
EU Funding Amount: 243,325,131 HUF
Project Overview
As a result of the research and development project, two new families of high-performance girders are being developed:
- a girder with a wider flange width for span lengths of 30-45 metres, with an expected structural depth of approximately 1.80-2.00 metres;
- a new U-shaped bridge girder family for span lengths of 36-38 metres (the 37-38 metre range is expected to be achievable only if the development of structural lightweight concrete proves successful).
Within the framework of project GINOP_PLUSZ-2.1.1-21-2022-00095, research and development activities are being carried out to investigate the potential application of structural lightweight concrete. If the research confirms its feasibility, the above-mentioned girder types may also be produced using structural lightweight concrete.
The project results can be applied in the construction materials industry, particularly in bridge girder manufacturing and in the construction of high-load-bearing structural systems for specialised industrial buildings.
The most significant expected outcome of the project at company level is the creation, market introduction, and commercialization of new product groups in both domestic and international construction markets. Furthermore, the knowledge and new technologies developed during the project may also be commercialized.
With regard to the new bridge girders and transportation infrastructure concrete elements, the Hungarian State, represented by NIF (National Infrastructure Development Company) and MÁV (Hungarian State Railways), may become the primary user and implementer of the project results throughout the country.
Actual Project Completion Date: 30 May 2025
The project was implemented with the support of the European Union and co-financing from the Hungarian State.