Our company was responsible for the construction of the precast concrete structural frame of a 2,800 m² single-bay high-bay particle board storage warehouse with an internal height of 20.0 metres, built within the existing industrial premises of FALCO WOOD Industry in Szombathely.
One of the main challenges of the project was the redesign of the original concept. The building had initially been planned with a glued timber roof structure and in-situ reinforced concrete fire walls. In response to the client’s cost-efficiency objectives, the structure was re-engineered and ultimately realized using a precast reinforced concrete frame system.
The vertical load-bearing structure consists of 24.0-metre-high columns with 100/60 cm cross-sections and crane corbels. The roof structure is formed by 42.0-metre-span SIB purlins placed on longitudinal primary girders. The fire-resistant wall system comprises 200 mm thick solid wall panels, vertically connected between the columns using loop connections. Horizontal wall joints were constructed using a tongue-and-groove solution combined with mortar bedding, ensuring structural integrity and fire performance.