AUDI LOGISTICS PARK

Audi is also building its second logistics hall – as part of another ten billion forint investment. With the investment, the total area of ​​Audi Hungária Motor Kft. will increase from the previous four million square meters to more than five million. Hundreds of new jobs will be created. Similar to the first logistics center, the prefabricated structure was constructed by Ferrobeton Zrt. Our company was not only the manufacturer and assembler of the structure, but also constructively participated in the design of the economical structure already in the preparation phase.

Date of execution:
2015
Ground-space:
80000 m2
Location:
Győr
Services:
Design Execution Production Transport

Services

BezárásDesign

Design

BezárásProduction

Production

BezárásTransport

Transport

BezárásExecution

Execution