Audi factory expansion, Győr

In this new factory all production phases of vehicle manufacturing are performed in one location. Accordingly, a pressing plant, chassis production hall, lacquering and assembly plants were built. The total floor area of the halls exceeds 250,000 square meters. General contractor: KÉSZ Zrt. MARKET Építő Zrt.

Date of execution:
2011
Ground-space:
250000 m2
Location:
Győr
Services:
Design Execution Production Transport

Services

BezárásDesign

Design

BezárásProduction

Production

BezárásTransport

Transport

BezárásExecution

Execution