A cathode manufacturing facility consisting of a four-storey building with a total gross floor area of 42,000 m². Within the overall development, Ferrobeton was responsible for the erection of a 25,650 m² section, utilizing approximately 20,000 m³ of precast concrete elements.
The structure was assembled using cranes with a lifting capacity of up to 500 tonnes, enabling the installation of 35-tonne beams and 50-tonne columns.